Hemma organises a Belgian construction project into 12 phases. These phases come from the standard Belgian new-build sequence — not invented by Hemma, but the actual order contractors and architects expect work to happen.
| # | Phase | What it covers |
|---|---|---|
| 0 | Preparation & Design | Planning, permits, choosing an architect, soil surveys |
| 1 | Earthworks & Foundation | Excavation, foundations, drainage |
| 2 | Structural shell | Walls, floors, structural elements |
| 3 | Roofing | Roof structure, waterproofing, gutters |
| 4 | Exterior joinery | Windows, exterior doors |
| 5 | Rough-in MEP | Electricity, plumbing, HVAC rough-in |
| 6 | Screed | Floor screed |
| 7 | Plastering | Interior plaster and finishing |
| 8 | Flooring | Floor finishes |
| 9 | Finishing | Painting, fixtures, kitchen, interior doors |
| 10 | Outdoor works | Terrace, driveway, garden |
| 11 | Handover & Administration | Final inspection, EPA certificate, administrative close |
Open the Project Room. On a computer, every phase is listed down the left with where it stands in words — Done, Now · 7 of 10 milestones or Not started — and the phase you pick opens beside it. The room opens on the phase your build is in. On a phone, the room is the list of phases: tap one to open its own page, and Project Room at the top takes you back.
A phase shows how many of its milestones are completed, never a percentage of the build: milestones are what Hemma can actually see happen.
Each phase shows a Planned end. Until you set one it says Not planned yet: Hemma never works out an end date from the phase's estimated duration, because that is a guess and a guessed date looks like a promise. Choose Add a date, pick the day and choose Save. To move it, choose Change; to clear it, choose Change and then Remove the date. The day also shows in the calendar's Phases lane. See your project calendar.
A phase can be in one of three states:
Phases unlock in order. Phase 1 starts when the right milestones in Phase 0 are done. Phase 2 starts when Phase 1's conditions are met. Hemma updates this automatically as milestones complete.
Multiple phases can be active at the same time. In a real build, roofing, exterior joinery, and rough-in MEP often overlap. Hemma reflects that — it tracks which phases are active based on what has actually happened, not a rigid one-at-a-time sequence.
Hemma applies a construction template when you set up your project. A new build gets all 12 phases. A renovation or extension might start later in the sequence. The template sets the initial phase structure — you can see it in the Project Room and adjust each phase with Edit.
Can I add my own phases? Not yet. The 12-phase structure follows the Belgian standard. You can add custom milestones and decisions inside each phase.
A phase is stuck. How do I move it forward? Phases are driven by milestones. Open the phase in the Project Room, find the blocking milestone under Still to happen and either complete it manually or check why it has not auto-completed. See milestones — what completes automatically and what doesn't.
What if my build skips a phase entirely? You can mark all milestones in that phase as done manually. The phase will move to "done" and the next phase will become active.